Complete Concrete Solutions
63 professional concrete services for commercial projects across Johnson County and North Texas.
Capability Matrix
Concrete packages engineered for tilt wall, distribution, and structural work along the Cleburne rail and Johnson County corridors.
Blueprint Specs
180 x 220 ft
Up to 6000 PSI
Panel embeds + pick plans
6 - 20 finishers
120 yd³ / hr peak
Ff 50 / Fl 35
Service Areas
Serving 51+ cities across Johnson County and the greater DFW metroplex.
Local Cred Around Cleburne
Map coverage along Chisholm Trail Parkway, rail spur, and Lake Pat Cleburne. Crews dialed into Johnson County permitting flow and TXDOT specs.
- Chisholm Trail Parkway corridor access
- Johnson County permitting familiarity
- Rail spur and dock approach slabs
- Drainage and expansion joints tuned for Lake Pat Cleburne
City of Cleburne permitting lead times tracked weekly. TXDOT inspector relationships keep highway-frontage pours moving.

Permitting
Filed TXDOT drive approach permits in under 7 days.
Access
Staging yards within 10 miles of Lake Pat Cleburne projects.
QA & Safety
Mix design review with lab, pre-pour hold points, and test breaks logged against your spec. Field engineers track every batch truck and slump.
- Mix Design Process
We review every mix with the batch plant, run trial batches when PSI exceeds 5000, and document slump, air, and temp on site.
- Test Breaks
Cylinders pulled in pairs for 3, 7, and 28 day breaks with lab reports sent direct to your inbox same day.
- Field QA
Laser screed tolerance checks and F-number reports uploaded within 12 hours of pour completion.
Recordable Incidents
0
Rolling 24 month average
On-Time Pours
98%
Rolling 24 month average
Inspections Passed
97%
Rolling 24 month average
Ready To Discuss Your Commercial Concrete Project?
Get a detailed estimate with crew size, pour schedule, and mix design recommendations. Our estimating team responds within 24 hours.
Licensed & Insured | OSHA 30 on Every Pour | Serving Johnson County Since 2010